Demolition Permit in Edmond, OK — Cost, Requirements & Process
A demolition permit in Edmond is required before demolishing any structure or significant portion of a structure. The permit is moderate in fee but can be the longest-lead item on a project because it carries a mandatory Oklahoma DEQ asbestos NESHAP notification waiting period of 10 working days before any demolition can begin on most structures.
Asbestos notification applies to any structure built before 1980 and to any commercial structure regardless of age. The notification is filed with OKDEQ, not Edmond, and the demolition cannot start until the waiting period elapses. Many demolition permits are technically issued in 3 to 5 business days, but the project schedule must absorb the full DEQ window separately.
Utility disconnect confirmations are required from OG&E (electric in some Edmond areas), ONG (natural gas), and Edmond Electric/Edmond Water for utilities served by the city. PLL verifies the disconnect documentation before the permit is finalized. Commercial demolition over 5,000 sq ft requires a performance bond.
Who needs this permit
Is this permit required for your Edmond project?
Property owners and licensed demolition contractors removing any structure or major portion of a structure in Edmond. Includes whole-house demolition, accessory structure removal, partial structural demolition.
Edmond cost range
Expected permit fees in Edmond
Residential demolition: $85 flat. Small commercial under 5,000 sq ft: $250. Commercial 5,000-25,000 sq ft: $500. Large commercial over 25,000 sq ft: $1,000 + performance bond.
Fees reference the current Edmond Planning, Licensing & Development (PLL) fee schedule. Contact (405) 359-4780 to confirm for your specific project valuation.
Required documents
What Edmond Planning, Licensing & Development (PLL) needs from you
- Demolition permit application via PLL portal
- Oklahoma DEQ asbestos NESHAP notification (structures built before 1980 or any commercial regardless of age)
- Utility disconnect confirmations from OG&E, ONG, Edmond Electric, Edmond Water
- Site plan showing debris staging, traffic control if any portion is in the right-of-way
- Performance bond (commercial demolition over 5,000 sq ft)
- Contractor general liability insurance
Process & timeline
Step-by-step process in Edmond
- 1
Submit OKDEQ asbestos NESHAP notification first. Wait 10 working days minimum before demolition can start.
- 2
Submit demolition permit application to Edmond PLL. Issuance: 3 to 5 business days.
- 3
Confirm all utility disconnects.
- 4
Pre-demolition inspection of the site.
- 5
Demolition activity. Final site inspection after debris removal.
- 6
Typical clock time: 4 to 8 weeks including DEQ notification window.
Common reasons for rejection
Why Edmond rejects demolition permit applications
- OKDEQ asbestos NESHAP notification not filed
- Utility disconnect confirmations missing
- No traffic control plan when work affects ROW
- Commercial without performance bond
Skip the rejection cycle on your Edmond demolition permit
Permitly analyzes your project against Edmond Planning, Licensing & Development (PLL) requirements and generates a pre-filled application packet in under 3 minutes. First analysis is free.
Edmond Planning, Licensing & Development (PLL): (405) 359-4780 · 10 S Littler Ave, Edmond, OK 73034
Demolition permit FAQs — Edmond, OK
How long does a demolition permit take in Edmond?
Permit issuance is 3 to 5 business days, but the DEQ asbestos NESHAP notification carries a 10 working day mandatory waiting period that runs separately. Plan for 3 to 4 weeks total.
Do I need an asbestos survey before demolition in Edmond?
Yes for any structure built before 1980 and for any commercial structure regardless of age. The NESHAP notification is filed with OKDEQ.
Can I demolish my own backyard shed in Edmond?
For accessory structures under 200 sq ft, no permit is required. Larger sheds and structures, yes a demolition permit is required.